Dear Caribe Resort Owners,
Building Elevators
The B Building North East elevator electronic parts are obsolete. Cavinder has been diligently working to get this back up and is rebuilding the control boards to get this elevator back up and running. Parts for this analog technology have been extremely difficult to source even through the manufacturer due to the elevator’s age. The association will be looking at new elevators in the future and budgeting for this is already being worked on.
GST Insurance
GST Insurance holds Caribes’ property and flood insurance. They can be reached at: [email protected]
Parking Garage Repairs
Permanent shoring has been installed for the upper and lower parking garage sections of C & D. We are in the final stages and this should be completed by the end of this month.
Cabana Rentals
The cabanas and tiki bar on the lazy river deck are open for use. If you have not had the opportunity to book a cabana rental, you’re able to book a cabana on www.cariberesort.com and these are available to rent until October 31st, 2025. Daily rates vary depending on occupancy. Book yours today!
Coffee Shop
The coffee shop in D Building is open from 8am-5pm daily. Be sure to grab an early morning coffee and enjoy an assortment of pastries and lunch offerings while you’re here!
Rules & Regulations Reminders
- The front owner’s gate is an automated system. Absolutely no piggybacking is allowed and any vehicles that cause damage to the gate will be billed accordingly.
- No type of lighting can be displayed on any unit balcony. An exception has been made to allow Christmas lights and these can be displayed from Thanksgiving to January 15th. This new policy was voted on and approved by the Board of Directors at the Annual Homeowners Meeting. Security will enforce this policy.
- No type of grill that has an ignitor is allowed on any unit balcony. Charcoal, pellet, gas and smokers are all prohibited. Only electric grills are allowed on unit balconies.
Projects in Progress
- The replacement lazy river deck elevators are in the last stages of development and assembly. We anticipate installation of these starting in the next few weeks with one elevator shut down at a time. We anticipate completion in Spring of 2026.
- New wheelchair lifts are being ordered for all three indoor pools. Installation will take place once these come in.
- B ground level sliding doors are in the process of being replaced.
- Pool repairs will be started later this month for necessary repairs. Pool closures will occur as needed.
Upcoming Projects:
- New flooring will be done in the southside elevators in C Building. This work will begin Monday, October 13th.
As a reminder our next Annual Homeowners Association meeting will be held March 21st, 2026.
Thank you,
Caleb Glover